INVENTORY & CASH

Inventory Days of Supply Calculator

See how many days one SKU can actually cover after committed stock and safety stock, when it will run out, and how much to reorder for the lead time.

Units only. One SKU and one location; average daily sales are a planning rate, not a demand forecast.

Stock, demand and lead time

Planning model for one SKU and one location. Average daily sales are not a forecast; seasonality, promotions, inbound purchase orders and multi-location allocation are excluded.

Saved only in this browser. Nothing is uploaded.

Coverage and reorder gap

Days of supply

10.4Coverage shorter than lead time · Sellable units ÷ daily sales.
Sellable units260On hand minus committed.
Days to safety stock8.4Days until the safety buffer is reached.
Expected stockout—Today plus days of supply.
Safety stock reached—Today plus days to safety stock.
Reorder gap140Units needed to cover lead time plus safety stock.
Stock statusBelow lead timeCoverage compared with lead time and safety stock.

How coverage is calculated

Sellable units = on hand − committed. Days of supply = sellable ÷ average daily sales. Days to safety = (sellable − safety stock) ÷ daily sales. Reorder gap = daily sales × lead time + safety stock − sellable, floored at zero.

Your inputs are calculated in the browser and are not sent to a server.

Days of supply: how long one SKU actually lasts

On-hand stock is not the same as sellable stock. Open orders, reserved units and a safety buffer all reduce what is actually available. This calculator turns one SKU’s stock, committed units and daily sales into days of cover, expected dates and a reorder gap.

Sellable stock, not on-hand

A warehouse count of 300 units does not mean 300 units can be sold. If 40 are committed to open orders, only 260 are available. If the team also wants to keep a 50-unit safety buffer, the number of units that can be sold before the buffer is touched is 210.

The calculator separates these layers: on hand, committed, safety stock and sellable. That prevents the most common coverage mistake — dividing total stock by daily sales and concluding there is more runway than the store can actually use.

The formula and a worked example

Sellable units = on hand − committed. Days of supply = sellable ÷ average daily sales. Days to safety stock = (sellable − safety stock) ÷ daily sales. Reorder gap = daily sales × lead time + safety stock − sellable, with a floor of zero.

On hand 300, committed 40, safety 50, daily sales 25 and lead time 14 days: sellable is 260, days of supply is 10.4, days to safety is 8.4, and the reorder gap is 25 × 14 + 50 − 260 = 140 units. Because 10.4 days is shorter than the 14-day lead time, the status is “coverage shorter than lead time.”

Three dates that matter

The stockout date is today plus days of supply. The safety-stock date is today plus days to safety. The reorder-now date is the date by which the purchase order must be placed to arrive before the stockout, which is the stockout date minus lead time.

Dates are more useful than days in a team calendar: they turn a ratio into a deadline. Recalculate after a sales spike, a large wholesale order or a supplier delay; the dates move immediately.

Coverage shorter than lead time

If days of supply is less than lead time, the current stock will not cover the next replenishment. The reorder gap shows how many units are missing to cover lead time plus safety stock. In the example, 140 units are needed just to reach the lead-time-plus-safety position.

A gap does not always mean an emergency. There may be inbound stock, a faster backup supplier or a planned allocation. The model does not know those; it flags the gap so the team can check them.

Where the model stops

Average daily sales are a planning rate. Seasonality, promotions, new product launches and wholesale orders can change the real rate quickly. Inbound purchase orders, multi-location allocation, backorders and bundle component demand are also outside the single-SKU view.

Use the safety stock calculator to derive a buffer from demand and lead-time variability, and the CSV reorder planner to apply review cycles, MOQ and pack multiples across many SKUs.

How to use it week to week

Run the calculation for the SKUs that carry the most revenue or the longest lead times, not every SKU every day. Compare the coverage date with the supplier’s next order window and set an alert a few days before the safety-stock date.

When the status changes, record why: a promotion, a late shipment or a data error. Those notes make the next reorder decision faster than the number alone.

Inventory references checked October 2026: Shopify inventory reports · ShipBob days of supply · Inventory Planner

Should I use on-hand or available inventory?+

Use the number that reflects what can still be sold. This calculator subtracts committed units from on hand to approximate available stock. If your platform already shows available inventory, enter that as on hand and set committed to zero.

Why is days to safety stock lower than days of supply?+

Days of supply measures until zero sellable stock. Days to safety measures until the safety buffer is reached, which happens earlier because the buffer is held back from sale.

Does this include inbound purchase orders?+

No. Inbound stock is excluded. If a purchase order is expected before the stockout date, note it separately and reduce the reorder gap accordingly.

What does a negative days-to-safety value mean?+

It means sellable stock is already below the safety stock target. The buffer has been breached, even if there are still units available to sell.

How is this different from the inventory reorder planner?+

This is a single-SKU coverage view with dates and a lead-time gap. The reorder planner works from CSVs across many SKUs and adds review cycles, MOQ, pack multiples and purchasing quantities.

NEXT STEP